This view shows the location of the new shed with the proposed new siding. - Paul Molyneux-Berry.
This view facing approximately north shows site on the 3rd May 2009 after initial levelling work. Unfortunately the close proximity of 'Mother Wales' under this slate waste base has precluded the addition of a pit within the budget. The large building on the right is the existing carriage works with the covered carriage siding of 13 road on the left. - Andrew Nelms
This view from the 3rd May 2009 shows the newly reinforced rain water drain passing round the corner of the carriage works and under the corner of the site for the new shed. - Andrew Nelms
This photograph is from the 23rd May 2009 shows the points ready to be inserted into 15 road to its right. The C2 can be seen poking out from under a white tarpaulin in the distance! - Andrew Nelms
September 2009. chippies Shane, Graham and David prepare some formwork - our flat wagon was an excellent workbench. - Paul Molyneux-Berry.
Fitting the awkward corner. September 2009 - Paul Molyneux-Berry.
Sam inspects the completed formwork. September 2009. - Paul Molyneux-Berry.
Ffestiniog Railway double engine Merddin Emrys steams past at the end of the day having left its train in the adjacent carriage sidings. September 2009. - Paul Molyneux-Berry.
Fitting of the lower layer of rebar for the first half of the base. 10th / 11th October 2009. - Andrew Nelms
Completed rebar on the first half of the base ready for the concrete. 10th / 11th October 2009. - Andrew Nelms
View from the shed site towards Porthmadog.10th / 11th October 2009. - Andrew Nelms
Members of the C2 Project Group (Paul, Andrew and Jon) casting the concrete on the final day. 23/Oct/2009. - Dave Thurlow.
Members of the C2 Project Group, (Sam, Paul and Jon) casting the concrete on the final day. 23/Oct/2009. - Dave Thurlow.
Belonging to Porthmadog Concrete Ltd:The longest concrete conveyor in Wales apparently! 23/Oct/2009. - Dave Thurlow.
Andrew tidying up the join between the two halves of the base. 23/Oct/2009. - Dave Thurlow.
The scaffold poles were part of a tent that we had constructed due to forecast rain that evening. The tent was taken down the following morning. 23/Oct/2009. - Dave Thurlow.
Completed concrete base, 8-Nov-2009. Unfortunately a puddle has formed in the middle of the base but not bad for a mainly amateur effort! It isn't likely to fill up with water once a roof is on it in any case. - Andrew Nelms
Shed construction day 2. 24th Nov 2009. - Norman Bond.
Shed construction day 2. 24th Nov 2009. - Norman Bond.
Aerial view of shed construction, day 2, 24/11/09. - Dave Thurlow.
Aerial view of shed construction, day 3, 25/11/09. - Dave Thurlow.
Fixing the uprights, day 3, 25/11/09. - Dave Thurlow.
Shed construction with the Cob and Porthmadog as a backdrop. day 4, 26/11/09. - Dave Thurlow.
Aerial view of shed construction, day 4, 26/11/09. - Dave Thurlow.
Aerial view of completed shed, 03/12/09. - Dave Thurlow.
Completed shed, 4/12/09. - Norman Bond.