C2 Photo Album

album:jan-2011

Latest news from the C2 Project - January 2010

Driver's side motion before any removal works. - Andrew Nelms 27/11/10
C2-800-202v3.jpg
C2-800-199v3.jpg
Alistair eyes up the fireman's side motion. - Andrew Nelms 27/11/2010
Paul turns the heat up on the driver's side cross head - Andrew Nelms 27/11/10
C2-800-208v3.jpg
C2-800-206v3.jpg
Removal of the driver's side piston from from the cross head. - Andrew Nelms 27/11/10
Various parts of the motion including expansion links, radius rods and slide bars. - Andrew Nelms 9/01/11
C2-800-205v3.jpg
C2-800-201v3.jpg
Gear return crank stamped number 202 - Andrew Nelms 09/01/11
Removal of the Drivers side piston valve took place in November 2010. - Andrew Nelms 28/11/10
C2-800-211v3.jpg
C2-800-204v3.jpg
Removal of the Fireman's side piston rod in Jan 2011. - Andrew Nelms 9/01/11
Piston Valve assemblies, cleaned and oiled up. - Andrew Nelms 9/01/11
C2-800-200v3.jpg
C2-800-203v3.jpg
Paul has added new markings to our wagon number 80. - Andrew Nelms 28/11/10
Just in case there is any doubt who this wagon belongs too! - Andrew Nelms 23/11/10
C2-800-210v3.jpg
C2-800-198v3.jpg
Tare Weight 2.1 tonnes, Load Capacity 5.0 tonnes - Andrew Nelms 28/11/10
Overall width 1.37m, Overall length 5.92m - Andrew Nelms 28/11/10
C2-800-207v3.jpg
C2-800-209v3.jpg
Inside the C2 shed on the 9th Jan 2011. - Andrew Nelms 9/01/11