Cleaning and painting inside the firebox using forced air extraction. A full face mask with particulate filters was also used. Thanks Dave for your efforts. A thoroughly unpleasant job for you. - Andrew Nelms
C2-800-2012v3.jpg
C2-800-2013v3.jpg
The frame for the new cab floor cut and put in place to demonstrate the basic structure. - Andrew Nelms
Loco and tender re-united with the boiler - Andrew Nelms
C2-800-2014v3.jpg
C2-800-2015v3.jpg
Boiler newly fitted back onto the frames. Left to right: Dave 2, Dave 3, Bobby (inside firebox) and Alasdair. - Andrew Nelms
Preparing to lift the boiler - Andrew Nelms
C2-800-2016v3.jpg
C2-800-2017v3.jpg
Lowering the boiler onto the frames - Paul Molyneux-Berry
New key for the turbine shaft. - Erle Ford
C2-800-2018v3.jpg
C2-800-2019v3.jpg
New key for the turbine shaft. - Erle Ford
New turbine trial fitted to the shaft:- Erle Ford
C2-800-2020v3.jpg
C2-800-2021v3.jpg
New turbine trial fitted to the shaft:- Erle Ford
Rolling the turbine blade retaining band. - Erle Ford
C2-800-2022v3.jpg
C2-800-2023v3.jpg
Rolling the turbine blade retaining band. - Erle Ford
Machining the balance weights. - Erle Ford
C2-800-2024v3.jpg
C2-800-2025v3.jpg
Machining the balance weights. - Erle Ford
Fitting the retaining band to the turbine at home: Erle Ford