album:October 2018

C2-800-1139v3.jpg
C2-800-1140v3.jpg
Erle heats up a coupling rod joint, to help in extracting the taper pin.
C2-800-1141v3.jpg
C2-800-1142v3.jpg
Tender brake safety brackets: the starting point!
C2-800-1143v3.jpg
C2-800-1144v3.jpg
Chris polishes surface rust off one of the coupling rod bearing cover plates.
Caleb sets up a tender brake stretcher in the saw, ready to cut it to length.
C2-800-1145v3.jpg
C2-800-1146v3.jpg
Two old safety straps now the correct shape, and a new one with two of the three bends completed.
C2-800-1147v3.jpg
C2-800-1148v3.jpg
Sam sets up the next bend in a brake stretcher safety strap.
C2-800-1149v3.jpg
C2-800-1150v3.jpg
Measuring the lateral position of the driving crankpin relative to a parallel placed on the mounting faces for the cylinder and motion bracket.
Coupling rod parts all seprated at last! We'd been putting off this job for a few years.
C2-800-1151v3.jpg
C2-800-1152v3.jpg
Alasdair polishes surface rust off one of the coupling rod bearing cover plates. Sometimes it was less cold outside than it was in the shed!
Erle does some careful measuring of the connecting rods. This one is bent!
C2-800-1153v3.jpg
C2-800-1154v3.jpg
Andrew and Dave measure up the boiler backhead in preparation for designing the cab layout.
A whiteboard full of jobs. By the end of the working party we'd completed almost all of these, including number 4!
C2-800-1155v3.jpg