Turbo-generator load bank under construction.
C2-800-2094v3.jpg
C2-800-2095v3.jpg
Turbo-generator load bank under construction.
Turbo-generator load bank - holes cut in the control panel for the gauges, meters and switches.
C2-800-2096v3.jpg
C2-800-2097v3.jpg
C2-800-2098v3.jpg
C2-800-2099v3.jpg
Tender tank frame mounted on the frames. Note - the shape of this frame does not denote the final shape of the tender tank. There will be much more parts to attach first!
Dave 2 and Bobby making the tender tank mock up frame.
C2-800-2100v3.jpg
C2-800-2101v3.jpg
Machining the governor valve piston sleeve.
Machining the governor valve piston sleeve.
C2-800-2102v3.jpg