C2 Photo Album

album:Easter_2024

Erle continues to machine the new screw reverser bracket.
C2-800-2268v3.jpg
C2-800-2269v3.jpg
Erle continues to machine the new screw reverser bracket.
The basic shape of the screw reverser bracket is now becoming obvious.
C2-800-2270v3.jpg
C2-800-2271v3.jpg
Erle has generated another wheelbarrow full of swarf.
Chris has been measuring up the mounting brackets for the loco head and tail lamps.
C2-800-2272v3.jpg
C2-800-2273v3.jpg
Chris has painted the draincock weighshaft.
Drain cock linkage assembly trial fitted by Dave 2 with the new pins as made by Dave 1 and James.
C2-800-2274v3.jpg
C2-800-2275v3.jpg
Drain cock linkage assembly trial fitted by Dave 2 with the new pins as made by Dave 1 and James
Drain cock linkage assembly trial fitted by Dave 2 with the new pins as made by Dave 1 and James
C2-800-2276v3.jpg
C2-800-2277v3.jpg
Andrew re-machining the expansion link face plates.
Andrew helping Rob fix Garratt (NG/G16) number 130 on shed at Boston Lodge on Easter Sunday morning before it pulls the train from Porthmadog to Caernarfon. (Photo - Tim O'Donnell)
C2-800-2278v3.jpg