Erle continues to machine the new screw reverser bracket.
Erle continues to machine the new screw reverser bracket.
The basic shape of the screw reverser bracket is now becoming obvious.
Erle has generated another wheelbarrow full of swarf.
Chris has been measuring up the mounting brackets for the loco head and tail lamps.
Chris has painted the draincock weighshaft.
Drain cock linkage assembly trial fitted by Dave 2 with the new pins as made by Dave 1 and James.
Drain cock linkage assembly trial fitted by Dave 2 with the new pins as made by Dave 1 and James
Drain cock linkage assembly trial fitted by Dave 2 with the new pins as made by Dave 1 and James
Andrew re-machining the expansion link face plates.
Andrew helping Rob fix Garratt (NG/G16) number 130 on shed at Boston Lodge on Easter Sunday morning before it pulls the train from Porthmadog to Caernarfon. (Photo - Tim O'Donnell)