Chris measures the angle of the loco frame under the cab floor frame.
C2-800-2103v3.jpg
C2-800-2104v3.jpg
Chris measures the angle of the cabside.
With the wooden cab mock-up complete and the tender in progress, we took advantage of a break in the rain to photograph the loco outside.
C2-800-2105v3.jpg
C2-800-2106v3.jpg
The back of the cab didn't fit past the locker doors!
The arrangement of the hinged chimney cap was very crudely made out of scrap, but the concept of being able to cap the chimney from ground level is a good one and we may make a neater version in due course.
C2-800-2107v3.jpg
C2-800-2108v3.jpg
The hinged chimney cap, before we removed it. The opposite hinges were for the 'lobster pot' spark arrestor, while the other brackets once carried a 'Chinese Hat' - which may have been an alternative attempt at a spark arrestor.
The highest part of the loco is the chimney and this is right on the limit of the loading gauge. We might shorten it a little in due course, but it ought to fit for the gauging run.
C2-800-2109v3.jpg
C2-800-2110v3.jpg
Measuring the height of the dome - to the highest stud on the inspection hatch. Yellow tool cupboard now repositioned!
Measuring the cab height. The ribs on the roof represent the sliding rails for the sunroof which will be fitted to the permanent cab.
C2-800-2111v3.jpg
C2-800-2112v3.jpg
Checking the tight clearance between the tender frame and cab backsheet.
C2-800-2113v3.jpg
C2-800-2114v3.jpg
With the woodwork painted and the chimney fitted, it looks nearly finished! Looks are deceiving, but it'll do for the gauging run.
Despite adjusting the drawbar, we still had a slight interference between the tender and cab backsheet on the extremely sharp curve outside our shed. In the long term we will make a slightly longer drawbar to resolve this problem.
C2-800-2115v3.jpg
C2-800-2116v3.jpg
The handbrake column mounted on the tender tank mockup.
View inside the tender tank mock-up - this is very simplified and primarily intended for assessing sightlines and aesthetics.
C2-800-2117v3.jpg
C2-800-2118v3.jpg
The temporary cab floor in position. This will stop us falling through the gaps for now, but will eventually be replaced with a wooden planked floor.
We know several Sams, but I'm not sure which one we love...
C2-800-2119v3.jpg
C2-800-2120v3.jpg
Overview of the wooden cab and tender before painting.
Mounting the chimney in place ready for the gauging run.
C2-800-2121v3.jpg
C2-800-2122v3.jpg
Regulator Sleeve having its piston port reamed under size. The next step is to create a chamber in side for steam to pass around the piston through the exit port. This will need a bespoke boring bar to get inside. The extra material left in the hole is to cover any damage by the boring bar should it contact the sides.
We used the scaffold tower and crane to retrieve the chimney from its storage shelf and bring it safely down to ground level.
C2-800-2123v3.jpg