C2 PROJECT
C2 Photo Album
album:Easter 2022
Erle starts to make the new steam turbine from a blank made of EN8 steel - Erle Ford


Erle measuring the diameter of the new steam turbine. - Erle Ford
Investigating the boiler dome cover inspection hatch - James Edwards.


Inside the boiler dome. The pipe on the left is the supply to the whistle and the hole on the right is the regulator valve port - James Edwards
More pictures of the new steam turbine - Erle Ford


More pictures of the new steam turbine - Erle Ford
More pictures of the new steam turbine - Erle Ford


The old steam turbine is beyond repair - Erle ford