Cylinder end covers. The closes one showing the new stud made by Erle.
Motion bracket showing the triangular packing plate which was sandwiched between it and the frames.
Yaw damper trial fitted between rear buffer beam and loco-tender drawbar.
Crosshead. We have 3 of these (one spare from China).
Measuring the straightness of the connecting rods.
No.3 of the Talyllyn railway at Abergynolwyn.
No.3 of the Talyllyn railway at Abergynolwyn.
No.3 of the Talyllyn railway at Wharf station in Tywyn ready to depart with the staff only special "Cold Turkey" train.
View from the top of the ladder after removing the redundant clock from above the roller-shutter doors. Erle and Dave 1 are posing for us!