Magnetic base drill set up to drill a hole in the rear bufferbeam. Thanks to Dylan for loaning us the correct tapping drill size.
C2-800-1736v3.jpg
C2-800-1737v3.jpg
The completed loco steam brake return spring arrangement. The turnbuckle will allow it to be adjusted to the correct setting.
In the C2 shed, this was not a comfortable temperature to be working in.
C2-800-1738v3.jpg
C2-800-1739v3.jpg
Outside, the river Glaslyn was looking more like a dried-up waterhole in the Serengeti.
The Tan-y-Bwlch water cooler (bottom left)
C2-800-1740v3.jpg
C2-800-1741v3.jpg
Loco cleaners try to cool off in the heat...
Britomart hauls a short freight train past Boston Lodge in late July. One day, we hope to couple the C2 to a long rake of these bogie wagons for a photo charter...
C2-800-1742v3.jpg
C2-800-1743v3.jpg
Stages in machining the adjuster cap - on the lathe
Stages in machining the adjuster cap - on the milling machine
C2-800-1744v3.jpg
C2-800-1745v3.jpg
Stages in machining the adjuster cap - trial fit and the original broken part can be seen below.
Stages in machining the adjuster cap - comparison to drawing.
C2-800-1746v3.jpg
C2-800-1747v3.jpg
Rocking grate components cleaned up for measuring.
Trial assembly of the tender brake gear over the carriage inspection pit.
C2-800-1748v3.jpg
C2-800-1749v3.jpg
Tender lateral brake links, made from scratch by Helen.
Handbrake column cup, machined by Paul and ready for welding in place.
C2-800-1750v3.jpg
C2-800-1751v3.jpg
Erle machined a flat on the back of the tender brake cylinder and a thrust block to match.
Tender brake cylinder mounted in position for reaming the holes.
C2-800-1752v3.jpg
C2-800-1753v3.jpg
Temporary support frame for the tender handbrake column, made from offcuts by Helen and Paul
Handbrake column in place on the temporary support.
C2-800-1754v3.jpg
C2-800-1755v3.jpg
Air inlet guard for the turbogenerator cooling fan, made by Erle using a fretsaw.
C2-800-1756v3.jpg
C2-800-1757v3.jpg
Machining completed on the turbogenerator regulator housing, and Erle has now made some gaskets for the various joint faces.
C2-800-1758v3.jpg
C2-800-1759v3.jpg
The turbogenerator regulator adjuster cap, machined from solid by Erle to replace a badly damaged original.
Final machining now completed on the refurbished turbogenerator regulator housing.
C2-800-1760v3.jpg
C2-800-1761v3.jpg
The original turbogenerator piston spring housing, badly cracked and equally badly repaired!
Detail of the various grooves in the turbogenerator piston spring housing. Thanks to Dewi for his advice on machining these.
C2-800-1762v3.jpg
C2-800-1763v3.jpg
Stages in machining its replacement from solid cast iron (1)
Stages in machining its replacement from solid cast iron (2)
C2-800-1764v3.jpg
C2-800-1765v3.jpg
Stages in machining its replacement from solid cast iron (3)
The turbogenerator piston spring housing partly complete, compared to the original and the 3D-printed plastic test piece.
C2-800-1766v3.jpg
C2-800-1767v3.jpg
Stages in machining its replacement from solid cast iron (4)
Stages in machining its replacement from solid cast iron (5)
C2-800-1768v3.jpg
C2-800-1769v3.jpg
C2-800-1770v3.jpg
C2-800-1771v3.jpg
Draft drawing for the central ashpan: following the regauging the ashpan arrangements are rather constrained and this is an option that would suit the current ash disposal arrangements used on the FR.
Andrew welds the tender handbrake column cup into place on top of the tender frame.
C2-800-1772v3.jpg
C2-800-1773v3.jpg
Andrew welds the boiler diaphragm plate bracket on to the loco frames.
A lengthy freight train of bogie wagons formed up for the WHR 'Superpower' weekend. This would look good behind the C2!
C2-800-1774v3.jpg
C2-800-1775v3.jpg
Helen presses bushes into the tender brake lateral links.
Helen uses the radial arm drill to clean out the holes in the tender brake lateral links.
C2-800-1776v3.jpg
C2-800-1777v3.jpg
Motion roller bearing spacers machined by Chris.
A side view of the loco frames during the shunt moves. Soon this appearance will be significantly changed by the addition of the brake gear, and hopefully the coupling rods not long after.
C2-800-1778v3.jpg
C2-800-1779v3.jpg
Andrew welds the steam brake thrust block onto the tender frames.
This wasn't in the script! Thunderbird 'Upnor Castle' on a rescue mission driven by Paul. This stalwart 'Planet' diesel was built for the Royal Navy in 1954, and whilst rather basic and noisy it is reliable and ideal for standby duties. Over the years it has had its wheelbase, track gauge, gearbox and engine changed, amongst many other modifications!
C2-800-1780v3.jpg
C2-800-1781v3.jpg
Andrew welds the steam brake thrust block onto the loco frames. In the background is 'Palmerston' of 1864, one of the FR's older locos which has seen plenty of use recently on the COVID services.
C2-800-1782v3.jpg
C2-800-1783v3.jpg
Vent grilles for the turbogenerator, in their natural brass finish.
Checking the internal diameter of a bearing spacer sleeve being machined by Erle for the driving axle crankpin.
C2-800-1784v3.jpg
C2-800-1785v3.jpg
Turbogenerator regulator piston spring retainer - a new machined component to replace the corroded originial.
C2-800-1786v3.jpg
C2-800-1787v3.jpg
The second bearing spacer ready for parting off.
C2-800-1788v3.jpg
C2-800-1789v3.jpg
The face where the turbine cover mates with the regulator housing, ready for machining...
...and after skimming flat.
C2-800-1790v3.jpg
C2-800-1791v3.jpg
The vent grilles, now chemically blackened and rivetted to the turbogenerator casing.